Reserve Line Simulator
vs your line
—
Validate the move to compare it with your line
Reserve guarantee
72.00 hrs
Jan 2026 · 3-99-5
X-days
0/13
Golden 0/6
On-call days
17
Short-call limit 6
Move resultdraft
—
Validate a move to see its result
Calendar
Explicit reserve-line codesSchedule Calendar
Jan 2026 Bid Period
Jan 1 - Jan 30 · 30 days
Select a reserve-line code to start painting. Click the same code again to stop painting. Striped Prev/Next days sit outside the bid period and count only as legality context.
Boundary-only code
Use `Carry-In` only on striped `Prev` / `Next` dates when a fixed carry-in marker matters for validity.
Simulator Snapshot
Awarded X, Golden, and contextual reserve metrics stay visible while you edit the line.
Awarded X
0/13
Golden
0/6
Reserve blocks
0
X-like blocks
0
Jan 2026 Schedule
Select a day type, then click or drag to paint schedule days. Striped `Prev` / `Next` dates sit outside the current bid period and are validity context only.
Overview
Shared inputs| Measure | Value |
|---|---|
| Bid period | Jan 2026 |
| Reserve guarantee | 72.00 hrs |
| Allocated X-days | 13 |
| Painted X-like | 0 |
| Allocated Golden | 6 |
| On-call days | 17 |
Uses the Calculator's bid month, ALV, extra X-day flag and carry-in. Vacation paints as explicit V and CQ as explicit CQ, and both sync into the Calculator form; Simulator-only work and absence codes stay here and feed legality directly.
Validation
Parity & rules| Measure | Value |
|---|---|
| Painted vs allocated X | 0 / 13 |
| Painted vs allocated Golden | 0 / 6 |
| Scheduled reserve days | 30 |
| Available days | 30 |
| Short-call limit | 6 |
| Block | Count | Dates |
|---|---|---|
| Awarded X-day blocks | 0 | No awarded X-day blocks. |
| PBS work blocks | 1 | 2026-01-01 to 2026-01-30 (30) |
| PCS reserve-only blocks | 0 | No reserve-only gaps under PCS context. |
| Severity | Issue |
|---|---|
| Info | Golden-spacing validation uses bid-period thirds to operationalize the contract anti-stacking language. Holiday reserve-availability matching covers all nine APD holiday periods; Super Bowl Sunday is taken as the second Sunday in February. |
| Error | Painted awarded X-days are short by 13. |
| Error | Painted Golden X-days are short by 6. |
Rule context
Simulator-ownedThese controls feed the shared legality engine without changing the calculator form surface.
Using 3-99-5: min work 3, max work 99, max X-day blocks 5. Max Golden blocks remains 3.
PCS
Move validationPreset library
Create named PCS category presets and select one as the active rule source for move validation.
Enforce last-six restriction
Keep PCS moves out of the last six dates when that operational rule is in force.
Scenarios
ReserveScenarioV2Scenario exports carry canonical reserve-line day records, boundary context, rule context, assumptions, and the active PCS preset snapshot.
Legacy version 1 and earlier scaffold version 2 payloads still import, but they normalize into the new reserve-line model on load.